[ad_1]
BAKU, Azerbaijan, Could 20. The development of
Azerbaijan’s Aghdam-Fuzuli freeway is at the moment underway at a speedy
tempo, Pattern
reviews citing the State Company of Azerbaijan Vehicle Roads.
The inspiration of the freeway was laid throughout the go to of
President Ilham Aliyev and First Girl Mehriban Aliyeva to Fuzuli
district on October 17, 2021.
In keeping with the company, this freeway is one other street
infrastructure object within the Karabakh and East Zangezur financial
areas. It would facilitate the socio-economic growth of the
nation’s liberated lands.
The street, 64.8 kilometers lengthy and 15 meters huge, will consist
of 4 site visitors lanes. The width of the street shoulders in each
instructions will probably be 3.75 meters, whereas the width of the roadbed –
26.5 meters. The freeway is being constructed in accordance with
the primary technical class.
The removing of unsuitable soil, development of a brand new roadbed
are at the moment in progress, in addition to communication strains are being
transferred.
Bridge development can be underway on 4 sections of the
street.
The Aghdam-Fuzuli freeway is a continuation of the Barda-Aghdam
freeway, and passes via the territory of Aghdam, Aghjabadi and
Fuzuli districts, the company mentioned.
[ad_2]
Source link